RIO DE JANEIRO CONTRACTOR · ESTABLISHED 2010Projects across Brazil

DOCUMENTED PROJECT · OCTOBER 2026

Rio 2 Shopping: anchor points and lifeline installation

A documented Rio de Janeiro project: roof anchors, lifeline connections and eight recorded pull tests in October 2026.

Documented lifeline cable and connections on the Rio 2 Shopping roof
Photographs and technical report provided by JFS Empreiteira
08points tested
08recorded approvals
Oct 15, 2026test date
RJBarra Olímpica

PORTFOLIO / PROJECTS

Traceable work, from installation planning to documented testing.

JFS Empreiteira documented the installation of roof anchor points and a lifeline system at Rio 2 Shopping, in Rio de Janeiro's Barra Olímpica area. A technical report dated October 14, 2026 covers site conditions, components, assembly, point identification and test records.

01

Project scope

For fall-protection systems, receiving structures, anchor positions, access areas and traceability must be considered as part of project planning. The report records an initial inspection and anchor positioning followed by the documented installation.

02

Installation and identification

The report describes AISI 316 stainless steel eye-bolt anchors, specified fixings and steel lifeline cable connections with documented accessories. Individual labels link the installed points to the photographic and testing records.

03

Recorded pull tests

Eight points were tested on October 15, 2026. The test sheet records 1,500 kgf applied for two minutes per point, with no reported displacement or deformation. All eight results are marked approved. These findings relate solely to the tested installation and its recorded conditions.

04

Technical documentation

The material includes a project control sheet, work-at-height references, component identification, photographs, test results and an ART reference. System use is subject to the design conditions, qualified technical instructions and applicable inspections; this summary does not replace the complete report.

All technical figures relate only to the documented October 2026 installation. Requirements for other systems need project-specific professional assessment.