JFS EXPERTISE
Anchor point pull testing
Recorded pull tests and structured reporting for roof and building anchors.
Request a quote
Anchor point pull testing
Pull testing documents how an anchor behaves under a specified test condition. At Rio 2 Shopping, the October 15, 2026 report lists eight anchors tested at a recorded proof load of 1,500 kgf for two minutes each. All eight are recorded as approved without the reported displacement or deformation. These figures are project-specific findings, not general test instructions for other sites.
What we can evaluate
- Check the point identification and condition
- Prepare the test under the applicable technical scope
- Perform the specified test and record equipment and parameters
- Conduct the documented post-test inspection
- Organize the results and traceability records
Why this service matters
Written test results provide verifiable evidence about a particular test and support qualified technical decisions and future inspections.
Before requesting a quote
Did all tested anchors pass at Rio 2 Shopping?
The report shows eight tests and eight approvals under the documented conditions.
Is 1,500 kgf the standard load for every project?
No. That number is part of the Rio 2 Shopping record; test procedures must follow each project's requirements.
Does one test replace future inspection?
No. A one-time test does not replace any inspection or maintenance required by the system.
CONTACT JFS